Limitations & Assumptions

Limitations

The most significant limitation of the MB calculation is that there is no time factor included. That means that while a material balance calculation can tell us what happened, it can’t tell us when it happened. If we combine the material balance calculations with other methods it is possible to infer time information. The combination between the time information from well productivity equations and the pressure/production information from MBE can give time details. (more…)